July 2026, The Current Affairs – Part 22

THE CURRENT AFFAIRS

July 2026 Current Affairs β€” Part 22

Important Current Affairs for Government Exams | Science, Economy, Health & Energy

πŸ“š Part 22 Study Plan

This part covers five important developments in geothermal energy, coal gasification, healthcare, vaccines and long-duration energy storage. Read the key facts carefully and attempt the quiz at the end.

SCIENCE β€’ ENERGY β€’ HEALTHCARE

41. India Commissions First Geothermal Wells at Puga Valley

India commissioned its first and deepest twin geothermal wells at Puga Valley in Eastern Ladakh.

πŸŒ‹ Key Facts

  • Location: Puga Valley, Eastern Ladakh
  • Commissioned by: Lieutenant Governor of Ladakh
  • Executed by: ONGC Energy Centre
  • Well depth: 1,000 metres each
  • Altitude: More than 14,000 feet
  • Geothermal energy produces electricity using heat from inside the Earth.

⚑ How Geothermal Wells Work

  • Heat comes from hot rocks beneath the Earth's surface.
  • Water enters underground rock cracks.
  • Water gets heated and turns into steam.
  • Steam is used to generate electricity.
  • Hot water may emerge naturally as hot springs and sulphur fumaroles.
⭐ Remember: Puga Valley β†’ Eastern Ladakh β†’ First & deepest twin geothermal wells β†’ 1,000 metres each

42. National Coal Gasification Mission

India aims to achieve 100 Million Tonnes (MT) of coal gasification capacity by 2030 under its National Coal Gasification Mission.

⛏️ Key Facts

  • Target: 100 MT coal gasification capacity by 2030
  • Present operational/under implementation capacity: 22.6 MTPA
  • On 13 May 2026, the Government approved a new Surface Coal/Lignite Gasification Promotion Scheme.
  • Financial outlay: β‚Ή37,500 crore
  • Expected to utilise about 75 MTPA of coal/lignite.

🏭 Existing Projects

  • Jindal Steel Limited (JSL): 8 MTPA β€” Operational
  • Talcher Fertilisers Limited (TFL): 2.6 MTPA β€” Under implementation
  • 8 projects under β‚Ή8,500 crore Financial Incentive Scheme: 12 MTPA β€” Under implementation

πŸ”¬ Coal Gasification

  • Coal gasification is the process of converting coal into syngas (Synthetic Gas).
  • Syngas mainly contains Carbon Monoxide (CO) and Hydrogen (Hβ‚‚).
⭐ Remember: National Coal Gasification Mission β†’ 100 MT by 2030 β†’ β‚Ή37,500 crore scheme

43. Semaglutide 2.4 mg Approved for MASH

The Central Drugs Standard Control Organisation (CDSCO) approved Wegovy (Semaglutide 2.4 mg) for treating MASH.

πŸ’Š Key Facts

  • Medicine: Wegovy
  • Active ingredient: Semaglutide 2.4 mg
  • Developer: Novo Nordisk
  • Condition: MASH
  • MASH full form: Metabolic Dysfunction-Associated Steatohepatitis
  • MASH is a serious form of fatty liver disease that causes liver inflammation and damage.
  • It is the first injectable GLP-1 therapy approved in India for MASH.
⭐ Remember: Wegovy β†’ Semaglutide 2.4 mg β†’ Novo Nordisk β†’ MASH β†’ First injectable GLP-1 therapy approved in India for MASH

44. India Approves First Dengue Vaccine

India approved its first dengue vaccine, QDENGA (TAK-003), developed by Takeda Biopharmaceuticals.

πŸ’‰ Key Facts

  • Vaccine: QDENGA (TAK-003)
  • Developer: Takeda Biopharmaceuticals
  • Approved by: Drug Controller General of India (DCGI)
  • Approved age group: 4 to 60 years
  • It protects against all four dengue virus serotypes.
⭐ Remember: QDENGA (TAK-003) β†’ Takeda β†’ DCGI approval β†’ Age 4–60 β†’ Protection against all four dengue serotypes

45. Bondada Engineering – 100 MWh VRFB BESS Project

Bondada Engineering, in partnership with Delectrik Systems, received a Notification of Award (NOA) from NTPC Renewable Energy Ltd. (NTPC REL) for a 100 MWh VRFB BESS project.

πŸ”‹ Key Facts

  • Project: 100 MWh Vanadium Redox Flow Battery Energy Storage System (VRFB BESS)
  • Project location: Khavda Solar Park, Gujarat
  • Technology Partner: Delectrik Systems
  • It is India's first and largest grid-scale VRFB Battery Energy Storage System project.
  • VRFB is a Long Duration Energy Storage (LDES) technology.

⚑ VRFB Advantages

  • Operational life of over 25 years.
  • High safety and stable performance.
  • Near-zero degradation even with frequent charging and discharging.
  • Lower operational expenditure (OPEX).

πŸ”‹ VRFB vs LFP Batteries

  • LFP battery lifespan: 12–15 years
  • LFP systems largely depend on imported battery cells.
  • VRFB supports energy security through domestic vanadium resources.
  • The project helps reduce long-term import dependence.
⭐ Remember: Bondada Engineering + Delectrik Systems β†’ 100 MWh VRFB BESS β†’ Khavda Solar Park, Gujarat β†’ First & largest grid-scale VRFB BESS project in India

πŸ“ Part 22 Quiz

Answer all 5 questions. Your result will appear only after you submit the quiz.

QUESTION 1 OF 5

Where were India's first and deepest twin geothermal wells commissioned?

QUESTION 2 OF 5

What is India's target for coal gasification capacity by 2030?

QUESTION 3 OF 5

Wegovy contains which active ingredient and was approved for treating MASH?

QUESTION 4 OF 5

What is the name of India's first approved dengue vaccine?

QUESTION 5 OF 5

Where is India's first and largest grid-scale VRFB BESS project located?

Quiz Result

Your Score: 0 / 5

🎯 Part 22 Completed

Revise these important science, energy and healthcare developments before moving to the next part of the July 2026 Current Affairs Series.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top